Proses Refurbish
HPU Unit 1
| No | Deskripsi Item | Weight Factor (%) | Duration (Day) | Schedule Plan | Plan (%) | Actual (%) | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Last Week | This Week | Kumulatif | Last Week | This Week | Kumulatif | ||||
| 1 | Refurbish Tahap 1 | 100.00% | 13 | 05/02/2024 | 18/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.1 | Pembersihan | 8.00% | 1 | 05/02/2024 | 06/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.2 | Pengelasan Tube Power Pack | 23.00% | 3 | 06/02/2024 | 09/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.3 | Pembuatan tampungan oli | 8.00% | 1 | 09/02/2024 | 10/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.4 | Penambahan Filter Oli | 8.00% | 1 | 10/02/2024 | 11/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.5 | Penggantian Piping System | 15.00% | 2 | 11/02/2024 | 13/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.6 | Penggantian Motor & Pompa | 8.00% | 1 | 13/02/2024 | 14/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.7 | Penggantian Flexible Hose | 8.00% | 1 | 14/02/2024 | 15/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.8 | Modifikasi Tangga | 8.00% | 1 | 15/02/2024 | 16/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 1.9 | Pengecatan | 15.00% | 2 | 16/02/2024 | 18/02/2024 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2 | Refurbish Tahap 2 Unit 1 | 100.00% | 17 | 23/08/2026 | 09/09/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.1 | Rekondisi Sitem Control | 35.00% | 6 | 23/08/2026 | 29/08/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.2 | Perbaikan Piping Sistem | 12.00% | 2 | 29/08/2026 | 31/08/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.3 | Perubahan Desin Dudukan Sampson Post | 12.00% | 2 | 31/08/2026 | 02/09/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.4 | Modifikasi Sensor Silinder Stroke | 12.00% | 2 | 02/09/2026 | 04/09/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.5 | Pengecatan | 12.00% | 2 | 04/09/2026 | 06/09/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.6 | Function Test by QC IPK | 12.00% | 2 | 06/09/2026 | 08/09/2026 | 100.00% | 0.00% | 100.00% | 100.00% | 0.00% | 100.00% |
| 2.7 | FAT | 6.00% | 1 | 08/09/2026 | 09/09/2026 | ||||||